Industries

Solutions by industry: what you are building, delivered as one project

Buyers come to us with a job, not a product code: a battery factory, a sheet-metal shop, a data hall, a fiber rollout. Each solution below combines equipment from our four product lines with the services that make it work, under one contract and one project manager.

Industries with complete solutions
6
Product lines: Make, Power, Connect, Sense
4
Production-line projects since 2009
3,000+
Countries with ZeroLine customers
58

Projects

Projects that span product lines

The scope, scale and schedule of projects like this. Ask us for references in your country.

  • Typical scope PowerMake

    8 PPM energy-storage module and PACK line

    A fully specified prismatic line for a storage integrator moving PACK assembly into its own market.

    Output
    ≈ 2.46 GWh a year (314 Ah)
    Stations
    21 in three segments
    Footprint
    55 × 9 × 3.5 m
    Schedule
    ≈ 5–7 months to production
    • Cell test and sorting
    • Stacking and busbar laser welding
    • PACK assembly
    • EOL and air-tightness test
    • MES
    • Installation and ramp-up

    Typical markets · Gulf states, India, Southeast Asia

  • Typical scope ConnectPowerSense

    Edge data center: cabling plus battery backup

    Fiber cabling, optics, battery storage for backup and temperature sensing for a regional edge site, under one contract.

    Scope
    Connect + Power + Sense
    Backup
    Lithium battery storage
    Monitoring
    Fiber temperature sensing
    Contract
    One, for all three
    • Structured cabling
    • Transceivers
    • Battery storage cabinets
    • Temperature monitoring
    • Commissioning support

    Typical markets · Africa, Central Asia, Southeast Asia

  • Typical scope Connect

    Optical cable plant for a national market

    A first plant making the drop, duct and ADSS cable a country imports today, with fiber supplied from Optics Valley.

    Products
    Drop, duct and ADSS cable
    Lines
    Coloring, loose tube, stranding, sheathing
    Lab
    Optical, mechanical and climate tests
    Schedule
    ≈ 9–14 months to first cable
    • Market and product-mix study
    • Plant layout and utilities
    • Lines and test lab
    • Training in Wuhan
    • Long-term fiber supply

    Typical markets · Africa, Middle East, Central Asia

All project types

Start a project

Not sure where you fit?

Tell us what you are building and where. An engineer replies with the solution, the equipment and a first price.

What do you need?
Message us on WhatsApp