Production lines for automotive and EV parts
Wuhan is both China's Optics Valley and one of its largest car-making centres. ZeroLine combines the two: laser welding, marking and inspection from Optics Valley with assembly and test equipment from Wuhan's automotive supply chain, delivered as working cells and lines for parts makers building production close to their customers.
- From one robot cell to a complete assembly line
- Cell → line
- Traceability: laser-marked codes and MES records
- Per-part
- Production-line projects ZeroLine has delivered
- 3,000+
- Every line runs your parts in Wuhan before it ships
- FAT
Scope
What we build
-
Make
Welding cells
- Robotic laser welding for brackets, housings and trays
- Robotic spot and MIG welding
- Fixtures, positioners and safety guarding
-
Power
E-drive and battery
- Hairpin stator laser welding
- Motor and gearbox assembly stations
- Battery module and PACK lines
-
Make
Marking and traceability
- Data-matrix and QR codes on metal and plastic
- Code verification by camera
- MES with part genealogy
-
Sense
Inspection
- Vision inspection of welds and assembly
- Dimensional checks
- Thermal inspection where it fits
-
ZeroLine
Assembly and test
- Manual, semi-automatic and automatic stations
- Pressing, screw-driving and dispensing
- Leak test and end-of-line functional test
- Conveyors and error-proofing
How it runs
How a line project runs
- 01
Part and volume
Drawings, annual volume, variants, takt and your customer’s quality requirements.
Week 1
- 02
Process and concept
Process flow, station list, cycle-time study, layout and a priced proposal.
Weeks 2–5
- 03
Design and build
Fixtures and stations built at partner factories in Wuhan, with your parts used for trials.
Typically 3–6 months
- 04
Run-off
The line runs your parts at rate in Wuhan; capability data and video before it ships.
1–3 weeks
- 05
Install and launch
Installation, commissioning, training and support through your customer’s approval.
Typically 4–10 weeks
Projects
Typical projects
The scope, scale and schedule of projects like this. Ask us for references in your country.
- Typical scope
Hairpin stator laser welding cell
A fiber-laser welding cell with vision positioning for an EV motor supplier starting local production.
- Process
- Fiber laser, vision-guided
- Inspection
- Post-weld vision check
- Traceability
- Per-stator records
- Schedule
- ≈ 4–6 months to production
- Weld trials on customer stators
- Cell with fixtures and guarding
- MES connection
- Run-off in Wuhan
- Installation and training
Typical markets · Mexico, Turkey, Thailand, India
- Typical scope
Assembly and test line for automotive parts
A semi-automatic line with pressing, screw-driving, laser marking, leak and end-of-line test for a tier-2 supplier.
- Stations
- ≈ 8–16
- Traceability
- Laser-marked codes, MES
- Tests
- Leak and functional EOL
- Schedule
- ≈ 4–7 months to production
- Process and cycle-time study
- Error-proofing
- Gauges for capability studies
- Run-off with customer parts
- Launch support
Typical markets · Mexico, Morocco, Eastern Europe
Services
Services that come with it
- Sourcing and factory audit The right factory for your job, audited on site and compared like for like.
- Factory acceptance and inspection Nothing ships before it has run. You watch the test, then you pay.
- Installation and training Engineers on your site until it runs at rate, and a team that can run it after.
- Spare parts and support Spare parts, video support, service partners and upgrades for the life of the equipment.
FAQ
Questions buyers ask
What do you need to quote an assembly line?
Part drawings or 3D models, annual volume and working pattern, the number of variants, your target cycle time and any process your customer specifies. Samples help for welding and marking trials.
Can the line support our IATF 16949 system?
Yes. We build in what auditors look for: error-proofing, part traceability, recorded process parameters and gauges you can run studies on. Certification of your plant stays with you; the line gives you the evidence.
Do you do hairpin stator welding?
Yes, through partner factories in Wuhan that build fiber-laser hairpin welding cells with vision positioning and post-weld inspection. We trial-weld your stator before you order.
Can you work with our existing robots or PLC standard?
Usually, yes. Tell us your preferred robot and PLC brands at concept stage; most partner factories build to the customer’s standard.
Start a project
Plan your parts line
An empty plant, a part, a network or a product idea. Tell us where you are starting. An engineer replies with a plan and a quote.
- Emailsales@zerolineai.com
- WhatsApp+44 7762 362563
- OfficeWuhan, Hubei, China