Installation, commissioning and training

Our engineers install and commission lines and plants on your site, or guide your team by video for simpler machines, then train your operators and maintenance staff until the equipment runs at rate. For new plants, your engineers can also train on running lines in Wuhan before start-up.

Installation and commissioning for lines and plants
On site
Guided installation for single machines
Video
Operator training on Maxwave laser machines
Free
Training on running lines for plant teams
In Wuhan

After-sales

The engineers behind the support

What you get

What is included

  • ZeroLine

    Installation

    • Site readiness checklist before shipping
    • Positioning, connection and alignment
    • Supervision of local contractors
  • ZeroLine

    Commissioning

    • Running to the agreed output and quality
    • Site acceptance test
    • Punch list closed
  • ZeroLine

    Training

    • Operators
    • Maintenance and troubleshooting
    • Process and quality engineers
  • ZeroLine

    Handover

    • Manuals, drawings and parts lists
    • Spare-parts kit
    • A named support engineer

Scope by line type

The steps above are the same shape for every order. What happens on site depends on the line type. The matrix is a typical industry reference for that split, not a programme of days and not a price. Contact sales for a quote.

A single machine, such as a laser or a printer, is positioned, connected and run on your parts, with video guidance when the contract says so. A production line — a battery module and PACK line, a cable line or an automation cell — is placed, connected and run toward the output named in the contract, with your operators there. A turnkey plant adds the interfaces between machines and the handover to the plant team.

Ask the protocol for a site acceptance (SAT) report and for training records of the people who were in the room. The site acceptance test checklist is the list behind that report. Manuals, drawings and the spare-parts kit stay part of the handover already listed above.

Line typeTypical on-site workDeliverables to leave with
Single machinePosition, connect, align, and a short run on your parts; video guidance when the contract says soThe settings used, a training note, and the manuals already in the shipment
Production linePlacement, utilities, a dry run, then a run toward the agreed output with your operatorsSAT report, training records, and the punch list
Turnkey plantThe line steps, plus the interfaces between machines and the handover to the plant teamSAT report, training records for operators and maintenance, and the named support engineer

How it runs

How it works

  1. 01

    Site readiness

    Foundations, power, air and access checked against our list before shipping.

  2. 02

    Install

    Engineers on site, or video guidance for single machines.

  3. 03

    Commission

    Run to the agreed output and quality; site acceptance signed.

  4. 04

    Train

    Operators and maintenance staff, hands-on.

  5. 05

    Ramp up

    Support until the plant runs at rate.

Do your engineers speak English?

Yes. Field engineers work in English, and we can arrange interpreters for other languages on large projects.

What do we need ready before installation?

We send a site readiness checklist with the order: floor, foundations, power, compressed air, water and access. We check it with you before the equipment ships.