Installation, commissioning and training
Our engineers install and commission lines and plants on your site, or guide your team by video for simpler machines, then train your operators and maintenance staff until the equipment runs at rate. For new plants, your engineers can also train on running lines in Wuhan before start-up.
- Installation and commissioning for lines and plants
- On site
- Guided installation for single machines
- Video
- Operator training on Maxwave laser machines
- Free
- Training on running lines for plant teams
- In Wuhan
After-sales
The engineers behind the support
-
Maxwave after-sales engineers, Wuhan -
Electronics checked before assembly
What you get
What is included
-
ZeroLine
Installation
- Site readiness checklist before shipping
- Positioning, connection and alignment
- Supervision of local contractors
-
ZeroLine
Commissioning
- Running to the agreed output and quality
- Site acceptance test
- Punch list closed
-
ZeroLine
Training
- Operators
- Maintenance and troubleshooting
- Process and quality engineers
-
ZeroLine
Handover
- Manuals, drawings and parts lists
- Spare-parts kit
- A named support engineer
Scope by line type
The steps above are the same shape for every order. What happens on site depends on the line type. The matrix is a typical industry reference for that split, not a programme of days and not a price. Contact sales for a quote.
A single machine, such as a laser or a printer, is positioned, connected and run on your parts, with video guidance when the contract says so. A production line — a battery module and PACK line, a cable line or an automation cell — is placed, connected and run toward the output named in the contract, with your operators there. A turnkey plant adds the interfaces between machines and the handover to the plant team.
Ask the protocol for a site acceptance (SAT) report and for training records of the people who were in the room. The site acceptance test checklist is the list behind that report. Manuals, drawings and the spare-parts kit stay part of the handover already listed above.
| Line type | Typical on-site work | Deliverables to leave with |
|---|---|---|
| Single machine | Position, connect, align, and a short run on your parts; video guidance when the contract says so | The settings used, a training note, and the manuals already in the shipment |
| Production line | Placement, utilities, a dry run, then a run toward the agreed output with your operators | SAT report, training records, and the punch list |
| Turnkey plant | The line steps, plus the interfaces between machines and the handover to the plant team | SAT report, training records for operators and maintenance, and the named support engineer |
How it runs
How it works
- 01
Site readiness
Foundations, power, air and access checked against our list before shipping.
- 02
Install
Engineers on site, or video guidance for single machines.
- 03
Commission
Run to the agreed output and quality; site acceptance signed.
- 04
Train
Operators and maintenance staff, hands-on.
- 05
Ramp up
Support until the plant runs at rate.
FAQ
Questions buyers ask
Do your engineers speak English?
Yes. Field engineers work in English, and we can arrange interpreters for other languages on large projects.
What do we need ready before installation?
We send a site readiness checklist with the order: floor, foundations, power, compressed air, water and access. We check it with you before the equipment ships.
Start a project
Plan installation and training