Turnkey production plants, from an empty building to running production

When you need a factory rather than a machine, ZeroLine plans the process and layout, integrates equipment from several partner factories under one contract, runs acceptance in China, then installs, trains your team and supports ramp-up on site. Since 2009 we have delivered more than 3,000 production-line projects for customers in 58 countries.

Production-line projects since 2009
3,000+
Partner factories to draw equipment from
1,200+
Contract, project manager and acceptance for the whole plant
One
Countries with ZeroLine customers
58

Scope

Plants we deliver

  • Power

    Battery module and PACK plants

    • Cell sorting to end-of-line test
    • Laser welding and traceability
    Battery and energy storage
  • Make

    Sheet-metal and fabrication plants

    • Cutting, forming, welding and finishing
    • Material flow and extraction
    Metal fabrication
  • Connect

    Optical cable plants

    • Loose-tube, stranding and sheathing lines
    • Drop cable, patch cords and test lab
    Fiber-optic cable plants
  • Make

    Automotive and EV parts plants

    • Welding cells and assembly lines
    • Leak and end-of-line test
    Automotive and EV parts

How it runs

What turnkey covers

  1. 01

    Feasibility

    Product mix, capacity, staffing and an investment estimate you can take to your board or bank.

    Weeks 1–6

  2. 02

    Plant design

    Process flow, layout for your building, utility lists, equipment specification and schedule.

    Weeks 4–12

  3. 03

    Build and acceptance

    Equipment from several factories built to one standard and accepted together in China.

    Typically 3–7 months

  4. 04

    Install and commission

    Our engineers lead installation and commissioning; local contractors handle civil works to our specifications.

    Typically 1–4 months

  5. 05

    Train and ramp up

    Operators and maintenance teams trained on site or in Wuhan; support until the plant runs at rate.

  6. 06

    Support

    Spare parts, remote support, retrofits and upgrades for the life of the plant.

Projects

Typical projects

The scope, scale and schedule of projects like this. Ask us for references in your country.

  • Typical scope PowerMake

    8 PPM energy-storage module and PACK line

    A fully specified prismatic line for a storage integrator moving PACK assembly into its own market.

    Output
    ≈ 2.46 GWh a year (314 Ah)
    Stations
    21 in three segments
    Footprint
    55 × 9 × 3.5 m
    Schedule
    ≈ 5–7 months to production
    • Cell test and sorting
    • Stacking and busbar laser welding
    • PACK assembly
    • EOL and air-tightness test
    • MES
    • Installation and ramp-up

    Typical markets · Gulf states, India, Southeast Asia

  • Typical scope Connect

    Optical cable plant for a national market

    A first plant making the drop, duct and ADSS cable a country imports today, with fiber supplied from Optics Valley.

    Products
    Drop, duct and ADSS cable
    Lines
    Coloring, loose tube, stranding, sheathing
    Lab
    Optical, mechanical and climate tests
    Schedule
    ≈ 9–14 months to first cable
    • Market and product-mix study
    • Plant layout and utilities
    • Lines and test lab
    • Training in Wuhan
    • Long-term fiber supply

    Typical markets · Africa, Middle East, Central Asia

  • Typical scope Make

    Sheet-metal workshop: cut, bend, weld, finish

    A job shop moving from plasma and TIG to fiber laser cutting and handheld laser welding.

    Cutting
    6 kW fiber laser, exchange table
    Forming
    2 CNC press brakes
    Welding
    2 handheld laser welders
    Schedule
    ≈ 8–12 weeks to production
    • Sample tests on customer parts
    • Shop layout and utilities
    • Laser cleaning for weld prep
    • Fume extraction
    • Installation and training

    Typical markets · Middle East, Eastern Europe, Latin America

  • Typical scope Make

    Assembly and test line for automotive parts

    A semi-automatic line with pressing, screw-driving, laser marking, leak and end-of-line test for a tier-2 supplier.

    Stations
    ≈ 8–16
    Traceability
    Laser-marked codes, MES
    Tests
    Leak and functional EOL
    Schedule
    ≈ 4–7 months to production
    • Process and cycle-time study
    • Error-proofing
    • Gauges for capability studies
    • Run-off with customer parts
    • Launch support

    Typical markets · Mexico, Morocco, Eastern Europe

All project types
What does turnkey include, and what does it not?

We are responsible for process, equipment, integration, acceptance, installation, commissioning and training. The building and civil works are usually done by a local contractor to the utility and foundation specifications we provide, and we supervise the interfaces.

Who is responsible if two machines from different factories do not work together?

We are. One contract covers the whole plant, so integration problems are ours to solve, not yours to arbitrate between suppliers.

How are payments structured?

In milestones tied to design approval, factory acceptance and commissioning, usually under a letter of credit. Deferred terms backed by export credit insurance are possible, subject to credit approval.

Start a project

Plan your plant

An empty plant, a part, a network or a product idea. Tell us where you are starting. An engineer replies with a plan and a quote.