Service
Payment terms and trade finance for equipment from China
A large order should not mean a large risk. We work with letters of credit, payment milestones tied to factory acceptance and commissioning, and, subject to credit approval, deferred payment terms backed by export credit insurance from Sinosure, China’s state export credit insurer. You pay against progress you can see.
- At sight or usance, under UCP 600
- L/C
- Balance due only after acceptance
- After FAT
- Insured deferred terms, subject to approval
- Sinosure
- Final payment after commissioning on lines and plants
- Retention
What you get
Options
-
ZeroLine
Letters of credit
- At sight or usance
- Documents aligned with factory acceptance
- Confirmed L/C where your bank allows
-
ZeroLine
Milestone payments
- Deposit at order
- Main payment after factory acceptance
- Retention after commissioning
-
ZeroLine
Deferred terms
- Open account or documents against acceptance
- Backed by Sinosure export credit insurance
- Subject to approval of your company’s credit
-
ZeroLine
Large projects
- Payment schedule matched to the build
- Advance-payment and performance guarantees on request
Letter of credit vs T/T for buying machinery from China
T/T here means a wire transfer, which the U.S. International Trade Administration lists under cash-in-advance (trade.gov/methods-payment). A letter of credit is the bank undertaking on the same page. The right-hand column also uses only the terms already stated above: at sight or usance under UCP 600, documents aligned with factory acceptance, a deposit at order, the main payment after factory acceptance, and a retention after commissioning. No fee percentage is given, because that page does not publish one.
The same path, from the company check through factory acceptance to site acceptance, is how to buy a production line from China safely.
| Letter of credit | T/T (wire transfer) | |
|---|---|---|
| Who carries the risk | The buyer’s bank commits to pay the exporter if the credit’s terms are met, as verified through the required documents. No payment obligation arises until the goods have been shipped as promised. | Payment is received before ownership of the goods is transferred, so the exporter avoids credit risk. The buyer carries the risk that the goods may not be sent. On the milestone terms above, the main payment waits until after factory acceptance. |
| Documents | Payment follows presentation of all required documents. On this page those documents are aligned with factory acceptance. The credit is at sight or usance, under UCP 600. | The Administration does not describe a bank document check for a wire. The milestone terms above release the main payment after factory acceptance and keep a retention until after commissioning. |
| Bank fees | The buyer establishes credit and pays the bank to issue the credit. The Administration does not publish a percentage. It says documentary collections are generally less expensive than letters of credit; that is not a T/T fee. | The Administration does not publish a wire-transfer fee. |
| Typical use | When reliable credit information about the buyer is difficult to obtain, but the exporter is satisfied with the buyer’s bank. Also the buyers on this page whose bank requires a letter of credit. | Wire transfer is one of the most commonly used cash-in-advance options. The non-LC schedule on this page is a deposit at order, the main payment after factory acceptance and before shipping, and a retention after commissioning. |
| Time to release | The bank pays once it has verified that the documents meet the credit. At sight that is on presentation; usance is a later date, as this page already offers under UCP 600. The Administration does not state a number of days. | Cash-in-advance is received before ownership transfers. On this page the main payment is after factory acceptance and before shipping. The Administration does not state a number of days for a wire. |
How it runs
How payment terms are agreed
- 01
Proforma
Priced offer with the payment options that fit the order size.
- 02
Choose terms
L/C, milestones or deferred terms.
- 03
Credit check
For deferred terms, insurer review of your company’s credit.
Typically 1–3 weeks
- 04
Contract
Terms written into one contract with ZeroLine.
Services
Related services
FAQ
Questions buyers ask
What is a typical payment schedule for a production line?
For example: a deposit at order, the main payment after factory acceptance and before shipping, and a retention after commissioning on your site. The split is agreed per project.
Can we pay after the equipment arrives?
Yes, with deferred terms backed by Sinosure export credit insurance, subject to credit approval of your company. Otherwise a usance letter of credit is the usual route.
What is Sinosure?
China Export & Credit Insurance Corporation, China’s state export credit insurer. Its cover lets exporters offer credit terms to approved overseas buyers.
Is a letter of credit safer than T/T when buying machinery from China?
A letter of credit is one of the most secure instruments the U.S. International Trade Administration describes: the buyer’s bank commits to pay the exporter if the documents meet the credit, and the buyer has no payment obligation until the goods have been shipped as promised (https://www.trade.gov/methods-payment). A T/T wire sent in advance is cash-in-advance on that page: the exporter is paid before ownership transfers, and the buyer carries the risk that the goods are not sent. On this page a T/T can still follow milestones, with the main payment after factory acceptance and before shipping, and a usance letter of credit is the usual route when payment is after arrival and Sinosure deferred terms are not approved. The Administration does not publish a fee percentage for either method.
Start a project
Ask about payment terms
An empty plant, a part, a network or a product idea. Tell us where you are starting. An engineer replies with a plan and a quote.
- Emailsales@zerolineai.com
- WhatsApp+44 7762 362563
- OfficeWuhan, Hubei, China