Key takeaways
- The quotation, contract, invoice and bank account must carry one company name. Look up the unified social credit code on gsxt.gov.cn before you pay a deposit.
- Write the specification, the factory-acceptance checklist and its numbers into the contract before the build starts.
- A letter of credit pays against documents. A T/T milestone schedule on this site pays the main sum after factory acceptance and before shipping, with a retention after commissioning.
- Nothing we ship is crated until the factory acceptance checklist is signed. You attend in Wuhan or watch on video.
- Saudi machinery uses SABER. Nigerian regulated goods use SONCAP, or a SONCAP import permit when a manufacturer is importing machinery for its own production.
- The site acceptance test, after installation, is a separate signature from the factory test. It uses your utilities, materials and people.
How to buy a production line from China safely
Buying a production line from China safely means checking the company before you pay, freezing the specification in the contract, tying the main payment to a factory acceptance test, and clearing your country’s certificates before the crates leave. After installation, a site acceptance test confirms the line on your own utilities.
The six steps below are the pages already on this site, in the order a buyer meets them. Nothing here adds a timeline, a fee or a guarantee that those pages do not already state.
1. Verify the company
How to verify ZeroLine before you pay is the check before the deposit. The quotation, contract, invoice and bank account must all carry one company name, and you can look up that company’s unified social credit code on China’s national enterprise credit system (gsxt.gov.cn). The page states that payments to personal or third-party accounts are not used, and that bank details are not changed by email or chat. The factory is named in the quotation. For Maxwave Laser and Stratavolt equipment, the authorisation letter comes with it.
2. Freeze the specification
Write what the line must do before anyone compares prices. For a battery module and PACK line, the request should name the cell, the module and PACK size, the takt, the stations, the end-of-line tests, traceability, and factory and site acceptance. The worked example, using only figures already published for the 8 PPM and 12–15 PPM lines, is how to choose a battery pack assembly line supplier.
Sourcing and factory audit is the matching step when you do not yet have a factory: a shortlist, an on-site audit, and offers compared on the same specification. Sample testing runs your part or your cells on the configuration that would be quoted. When the open question is who should find and check that factory, the separate guide is how to choose a sourcing agent in China.
3. Contract and payment
Payment terms and trade finance is where the money is agreed. The options already on that page are a letter of credit (at sight or usance, under UCP 600), milestone payments (a deposit at order, the main payment after factory acceptance, a retention after commissioning), and deferred terms backed by Sinosure export credit insurance, subject to credit approval. The comparison of a letter of credit vs T/T uses that page and the U.S. International Trade Administration’s description of letters of credit and cash-in-advance wires. It does not add a fee percentage.
The factory acceptance checklist says to keep technical acceptance, payment and shipment as separate signatures, and to tie the payment that releases shipment to the signed record.
4. Factory acceptance, before anything is crated
Factory acceptance and inspection states that nothing ships before it has run, against a checklist written into the contract. You attend in Wuhan or watch live on video, and your own inspector can attend. A failed check is fixed and tested again before crating. The balance payment follows a passed test, as agreed.
The factory acceptance test checklist, with the Excel template, is the list to put in the contract: configuration and safety, process and traceability, and handover. The numbers (output, first-pass yield, stops, cycle time) are agreed before the build, not during the test.
5. Shipping and the certificates your country asks for
Export, shipping and compliance covers the commercial invoice, packing list, certificate of origin, bill of lading, sea-worthy crates, and the market certificates named on that page, including SABER and SONCAP. Every order is screened against UN, EU, UK and US sanctions lists, and against China’s own export controls.
Two of those certificates have their own guides, each citing the official platform:
- SABER certificate for machinery for Saudi Arabia: a product certificate, then a shipment certificate for every consignment.
- SONCAP certificate for Nigeria: a Product Certificate and a SONCAP Certificate per shipment, or a SONCAP import permit when a manufacturer is importing industrial machinery for its own production.
6. Site acceptance and installation
Installation, commissioning and training sends engineers to site for a line, or guides a simpler machine by video, then trains operators and maintenance staff. Commissioning ends with a site acceptance test. The site acceptance test checklist is the companion to the factory checklist: it repeats the checks that transport can undo, and adds your utilities, your materials and your operators. The open punch list is closed before the final payment.
Where to start
Email sales@zerolineai.com or use the contact form with the cell or part, the target output, and the country the line will run in. The reply is the specification and the certificate route, not a price without them.