Key takeaways
- Ask who signs the contract and who is responsible after delivery.
- An audit should cover capability and capacity, the quality system and test equipment, the export record, and photos, video and a written report.
- Compare offers like for like on one specification, not on the supplier's own wording.
- Tie shipment to an agreed factory acceptance test. Nothing should be crated before the checklist is signed.
- Fee models are a commission on order value, a fixed service fee, or a margin built into the price. No public fee schedule is cited here.
A sourcing agent matches what you need to factories, audits those factories and compares their offers on one specification. The decision that matters is who is liable after delivery: your contract is either with the factory, with a company that resells the goods, or with one party that stays responsible for delivery and support.
What a sourcing agent does, and what it is not
| Buying direct | Trading company | ZeroLine | |
|---|---|---|---|
| Who you contract with | The factory you found | A company that buys the goods and resells them | One contract with ZeroLine, which stays responsible for delivery and support |
| How the factory is chosen | You choose it | The seller chooses it | A shortlist of factories that make it every day, with reasons for each choice |
| What you see of the factory | Whatever that factory shows you | Whatever the seller puts in the offer | On-site audits with photos, video and a written report |
| How offers are compared | The quotes you collected, often on different wordings | One price from the seller | Offers compared like for like on one specification |
Factory sourcing and audit in China is the service page: what ZeroLine does on a job. This guide is how to judge any agent, including us.
How to choose
Use this as a checklist before you pay a deposit.
- A legal entity you can verify. Ask for the legal name and the 18-character Unified Social Credit Code, and look the code up yourself. How to verify ZeroLine before you pay is one worked example of that check. The company-facts page states the same items for the contracting company: legal name Wuhan Maxwave Laser Technology Co., Ltd. (武汉迈镭激光科技有限公司) and Unified Social Credit Code 91420116MA4K3MXN7Y.
- An audit report, not a catalogue. It should cover production capability and capacity, the quality system and test equipment, the export record and references, and photos, video and a written report.
- Who signs the contract. One contract with ZeroLine stays responsible for delivery and support. A contract only with a factory, or only with a reseller, leaves support where that contract leaves it.
- Acceptance before shipment. Every machine and line should run a factory acceptance test against a checklist agreed in the contract. You attend in Wuhan or watch live on video, and the balance payment is tied to a passed test. The factory-acceptance service describes that test; the checklist itself is a separate guide.
- A sample before volume. Sample testing in Wuhan processes your part or drawing on the configuration that would be quoted, then sends video, photos, the settings and a quote for that setup. For laser machines the test is free apart from postage.
- Export documents named in the offer. The shipping service includes a commercial invoice and packing list, a certificate of origin, a bill of lading or air waybill, and test reports and manuals. Export, shipping and compliance from China is where those documents are listed.
Typical timeline
The sourcing steps, as published:
| Step | What happens | Time |
|---|---|---|
| Requirement | What it must do, volumes, target price and your market | Day 1 |
| Shortlist | Two to four matching factories with first prices | Typically 1–2 weeks |
| Audit | On-site visit and written report on the factories that remain | Typically 1–2 weeks |
| Recommendation | One recommended factory and offer, with the reasons and the risks | — |
| Contract | One contract with ZeroLine, who stays responsible for delivery and support | — |
How agents are paid
Three models are in common use. A commission is a percentage of the order value. A fixed service fee is agreed up front, separate from the goods. A margin is built into the price you are quoted, so you do not see a separate invoice for the work. No public fee schedule is cited on this page, and none of those models is given a number here. Ask which one applies, and ask whether the factory’s price and the agent’s fee are shown separately.
Red flags
- No legal name and no code you can look up.
- The factory is not named, and there is no audit report.
- Payment is requested to a personal account.
- The contract has no acceptance test before shipment.
None of these is a comment on a named company. They are checks you can make on any offer.
For a laser machine, the same checks sit next to the import risks in buying a laser machine from China.