Market PowerMakeConnect

Storage, production lines and fiber for Central Asia and Türkiye

Central Asia and Türkiye can be reached overland as well as by sea: trains run regularly from Wuhan to Almaty, and the Middle Corridor reaches Baku in about 18 days. Kazakhstan and Kyrgyzstan use the Eurasian EAC declaration, Uzbekistan its own GOST UZ certificate, and Türkiye CE marking. Demand comes from storage built alongside new wind and solar, and from Uzbekistan’s industrial push.

Regular trains from Wuhan to Almaty; about 18 days to Baku on the Middle Corridor
Rail
Wind and solar approved in Türkiye since 2022 with storage attached
33 GW
Uzbekistan's energy-storage target for 2030
4.5 GW
Certificates for Kazakhstan, Uzbekistan and Türkiye
EAC · GOST UZ · CE

Scope

What we supply in Central Asia and Türkiye

  • Power

    Storage

    • Containers for renewable plants with storage obligations
    • Commercial cabinets for industry
    • PCS and plant controllers
    Energy-storage systems
  • Power

    Production lines

    • Module and PACK lines for local storage assembly
    • Sheet-metal and enclosure lines
    • Optical cable lines
    Local manufacturing
  • Make

    Lasers and components

    • Laser machines for fabrication shops
    • Laser sources, scanners and optics for Turkish machine builders
    • Consumables at dealer prices
    Photonics and sensing components
  • Connect

    Fiber

    • Optical cable and FTTH materials
    • Data-center cabling
    • Test and splicing tools
    Fiber-optic connectivity
  • ZeroLine

    Certificates and rules

    • Kazakhstan and Kyrgyzstan (Eurasian Economic Union): EAC declaration, usually covering TR CU 010 machinery, 004 low voltage and 020 EMC, through an applicant registered in the union
    • Uzbekistan: not in the EAEU; GOST UZ certificates, for which EAC files can serve as the basis; duty and VAT exemptions for some technological equipment
    • Türkiye: CE marking with declaration of conformity, and a TAREKS reference at import
    Shipping and compliance
  • ZeroLine

    Shipping from Wuhan

    • Rail from Wuhan to Almaty and on to Uzbekistan
    • Middle Corridor rail and sea to Baku in about 18 days
    • Sea to Istanbul in about 34 days and to Mersin in about 38

How it runs

How a Central Asian or Turkish project runs

  1. 01

    Brief

    Product, site and the certificate route for your country.

    Day 1

  2. 02

    Quote with route

    Rail or sea, with transit time and landed-cost estimate.

    Typically 3–7 working days

  3. 03

    Certificates

    EAC, GOST UZ or CE files prepared during production.

  4. 04

    Acceptance and shipping

    Factory acceptance in Wuhan, then rail or sea.

  5. 05

    Install and support

    Training in Russian, Turkish or English; parts from stock.

Can equipment go from Wuhan to Central Asia by rail?

Yes. Container trains run regularly from Wuhan to Almaty, and from there to Uzbekistan and Kyrgyzstan; the Middle Corridor reaches Baku in about 18 days. Rail is faster than sea and usually costs more; we quote both.

Does Uzbekistan accept EAC certificates?

Not as such. Uzbekistan is outside the Eurasian Economic Union and issues its own GOST UZ certificates, though EAC test files can serve as their basis. Kazakhstan and Kyrgyzstan accept the EAC declaration.

Do machines for Türkiye need CE marking?

Yes. Türkiye applies the EU machinery and electrical rules through its customs union: CE marking with a declaration of conformity, checked at import through TAREKS.

Start a project

Plan your project

An empty plant, a part, a network or a product idea. Tell us where you are starting. An engineer replies with a plan and a quote.

What do you need?
Message us on WhatsApp