Product line Power

Solar PV module lines & BC stringers

ZeroLine supplies turnkey automated photovoltaic module production lines from 150 MW to 500–800 MW per year alongside core back-contact (BC), TOPCon and PERC cell processing machines: the CTM-BC60 / CTM-BC60B high-speed BC stringers (4,800–6,000 cells/h, 3BB–25BB, ≤ 0.2 % breakage) and CTM-72 high-speed MBB stringer (7,200 pcs/h), the CTM-S150 integrated cutting-stringing system (15,000 half-cells/h), the CTC-72S-BC and CTC-80S-BC water-assisted non-destructive laser cell cutters (4,800–7,200 pcs/h, ≤ 0.05 % breakage) and compact CTM-15 / CTM-15BC / CTM-25BC & CTC-20SBC units (1,100–2,500 pcs/h). Our team has delivered a complete 300 MW PV module production line in Bangladesh.

CTM-BC60 / BC60B, CTM-72 & CTM-S150 high-speed stringing output
4,800–15,000/h
Grade A cell breakage on CTC-72S-BC & CTC-80S-BC laser cutters
≤ 0.05 %
Automated single- and dual-glass PV module lines per year
150–800 MW
Photovoltaic module production line delivered in Bangladesh
300 MW

Turnkey proof & cleanroom photography

Delivered 300 MW Bangladesh handover, cleanroom engineers & live PV equipment

  • PV process engineer in a cleanroom commissioning bay holding up a soldered multi-busbar half-cell string in front of a CTM-BC60 high-speed stringer and touch HMI
    Process engineer inspecting soldered multi-busbar cell string at CTM-BC60
  • Twenty-two commissioning engineers and Bangladeshi customer team holding the acceptance banner for a delivered 300 MW photovoltaic module production line
    300 MW PV module production line turnkey acceptance in Bangladesh
  • Engineer operating an enclosed dual-lane CTC-72S-BC high-speed non-destructive laser solar cell cutter with dual vision monitors in the cleanroom bay
    CTC-72S-BC dual-lane non-destructive laser cell cutter during cleanroom run
  • Cleanroom photovoltaic module equipment bay with an engineer wiring enclosed green-and-white BC stringer cabinets alongside wooden export crates
    PV stringer & laser cell cutter cleanroom commissioning bay
  • Stäubli TS2-40 high-speed SCARA robot positioning solar cells onto the vacuum alignment stage inside a CTM-BC60 stringer with an engineer working behind
    Stäubli TS2-40 SCARA cell-alignment stage inside CTM-BC60 BC stringer
  • Active infrared heating chamber and pneumatic hold-down manifold inside a CTM-BC60 multi-busbar solar cell stringer
    Closed-loop infrared soldering & preheating chamber in live operation
  • Dual lanes of soldered multi-busbar half-cut solar cell strings advancing along the green inspection and discharge conveyor of a high-speed stringer
    Dual-lane soldered half-cell strings on stringer outfeed conveyor
  • Dual-lane perforated vacuum belts, pneumatic suction pickups and water-assisted thermal splitting stage inside a CTC-72S-BC laser cell cutter
    Water-assisted non-destructive laser splitting & drying belts (CTC-72S-BC)

Scope

Core models & turnkey line scope

  • Power

    CTM-BC60 / BC60B & CTM-72 high-speed stringers

    • CTM-BC60 (≥ 4,800 half-cells/h, 8,050 × 2,800 × 2,500 mm, 7,000 kg) and dual-lane CTM-BC60B (up to 6,000 cells/h, 98 % uptime) for 166–230 mm BC cells
    • CTM-72 high-speed multi-busbar stringer (up to 7,200 half-cells/h) for high-takt TOPCon and PERC module lines
    • 3BB–20BB standard (expandable to 25BB), Stäubli/Yaskawa robot + linear motor ±0.05 mm CCD alignment, automatic interleaf paper removal & ±7.5 °C infrared soldering (≥ 0.5 N pull)
  • Power

    CTM-S150 integrated cutting & stringing

    • Ultra-high-speed throughput up to 15,000 half-cells/h in one continuous footprint (166–230 mm cells)
    • Automated cell loading, laser scribing, thermal splitting, stringing, string discharge and layup interface
    • ±0.05 mm repeat positioning accuracy, up to 95 % uptime; CTM-BC60A option (6,000 pcs/h) with paper removal & flexible ribbon hold-down
  • Power

    CTC-72S-BC & CTC-80S-BC water-assisted laser cutters

    • CTC-72S-BC dual-lane cutter (4,000 × 2,700 × 2,700 mm, 5,000 kg): ≥ 4,800 BC or ≥ 6,800 TOPCon/PERC full cells/h at ≤ 500 mm/s scribing speed
    • CTC-80S-BC ultra-high-speed water-assisted cutter: up to 7,200 pcs/h for 156–230 mm delicate back-contact cells
    • 60 W pulsed grooving + 300–500 W CW thermal splitting with DI-water spray cooling, heated drying belt, BC paper removal/re-insertion & ≤ 0.05 % Grade A breakage
  • Power

    CTM-15 / CTM-15BC / CTM-25BC & CTC-20SBC compact line

    • CTM-15 (1,100 pcs/h TOPCon/PERC, 6,900 × 1,800 × 2,300 mm, 3,000 kg, strings up to 2,000–2,500 mm), CTM-15BC (1,000–1,500 pcs/h BC) and CTM-25BC (2,500 pcs/h BC)
    • CTC-20SBC non-destructive BC cell cutter: 2,000 pcs/h output with automated loading, laser grooving, splitting, inspection & unloading
    • Sized for 50–150 MW regional module plants, pilot BC lines, specialty modules and staged capacity expansion
  • Power

    150 MW & 500–800 MW turnkey module lines

    • 150 MW automated line (≈ 25–32 operators) and 500–800 MW automated line (≈ 27–34 operators)
    • Single-glass, dual-glass, bifacial, framed, frameless, half-cut and shingled modules (1,640–2,600 × 950–1,500 × 20–50 mm)
    • Layup & bussing cycle ≤ 20 s (full-cell) or ≤ 45 s (half-cell) with up to 99 % uptime across N-type, P-type, PERC, TOPCon & BC cells
    Delivered 300 MW Bangladesh PV line case

Verified PV stringer, laser cutter & turnkey line specifications

Every machine and module packaging line is built to your signed reference solar cell drawing and accepted on your cells before reinforced export crating:

Model / LineRated ThroughputCell / Module RangeAccuracy & BreakageFootprint / Uptime
CTM-BC60 / CTM-BC60B BC Stringer≥ 4,800 / up to 6,000 cells/h166–230 mm · 3BB–25BB BC±0.05 mm CCD · ≤ 0.2–0.25 % breakage8,050 × 2,800 × 2,500 mm · 95–98 % uptime
CTM-72 High-Speed MBB StringerUp to 7,200 half-cells/h166–210 mm TOPCon / PERC±0.05 mm CCD · ≥ 0.5 N pullHigh-speed dual-lane · ≥ 95 % uptime
CTM-S150 Cutting & Stringing SystemUp to 15,000 half-cells/h166–230 mm · inline scribe + string±0.05 mm repeat positioningContinuous monobloc · ≥ 95 % uptime
CTC-72S-BC Laser Cell Cutter≥ 4,800 BC / ≥ 6,800 TOPCon pcs/h166–210 mm · 120–220 µm±0.05 mm · ≤ 0.05 % breakage (≤ 500 mm/s)4,000 × 2,700 × 2,700 mm · 5,000 kg
CTC-80S-BC Water-Assisted CutterUp to 7,200 pcs/h156–230 mm BC / TOPCon / PERC±0.05 mm vision · ≤ 0.05 % breakageInline layup-ready · DI-water cooled
CTM-15 / CTM-15BC / CTM-25BC1,100 / 1,500 / 2,500 pcs/h166–210 mm · 3BB–20BB±0.1 mm · ≤ 0.25 % breakage6,900 × 1,800 × 2,300 mm · 3,000 kg
CTC-20 / CTC-20SBC Compact Cutter1,600 / 2,000 pcs/h156–220 mm PERC / TOPCon / BCCCD vision + non-destructive split1,000 × 650 mm · 220 V single-phase
150 MW & 500–800 MW Turnkey Lines150 MW/yr & 500–800 MW/yr1,640–2,600 × 950–1,500 mm≤ 45 s half-cell layup · N/P/BC≈ 25–32 / 27–34 operators · turnkey MES

How it runs

From cell datasheet to running PV module plant

  1. 01

    Cell & module spec

    Reference cell format (PERC, TOPCon or BC), busbar count, glass/frame dimensions and annual MW target.

    Week 1

  2. 02

    Cleanroom layout & quote

    Station takt balance, cleanroom floor layout, power/air/DI-water utility schedule and itemized turnkey proposal.

    Weeks 2–4

  3. 03

    Build & reference-cell FAT

    Stringers, laser cutters and line stations built and run on your reference cells in China — witnessed in person or on live video.

    Typically 3–5 months

  4. 04

    Export crating & shipping

    Fumigation-free wooden export crating numbered by station, customs documentation and sea freight.

    Typically 3–6 weeks

  5. 05

    On-site SAT & ramp-up

    PV commissioning engineers install, calibrate recipes, train shifts and hand over running production.

    Typically 6–10 weeks

Projects

Typical projects

The scope, scale and schedule of projects like this. Ask us for references in your country.

  • Delivered · Bangladesh Power
    PV process engineer in a cleanroom commissioning bay holding up a soldered multi-busbar half-cell string in front of a CTM-BC60 high-speed stringer and touch HMI

    300 MW photovoltaic module production line delivered in Bangladesh

    Turnkey 300 MW crystalline-silicon solar PV module production line delivered from factory acceptance in China to cleanroom installation, commissioning and production ramp-up in Bangladesh.

    Annual capacity
    300 MW / year
    Laser cell cutting
    ≤ 0.05 % breakage (Grade A)
    Stringer positioning
    ±0.05 mm CCD vision
    Delivery scope
    FAT · Export · On-site SAT
    • Non-destructive laser cell cutters
    • High-speed MBB stringers
    • Automated layup & bussing
    • Lamination, framing & EL/IV test
    • Export crating & sea freight
    • On-site commissioning & training
All project types
What makes back-contact (BC) solar cell stringing different from TOPCon or PERC?

Back-contact (BC) cells place all positive and negative electrodes on the rear side with zero front busbar shading, requiring single-side ribbon alignment, low-temperature soldering to prevent cell bow, and ±0.05 mm CCD vision positioning. The CTM-BC60B handles 166–230 mm BC cells at up to 6,000 cells/h with breakage kept at or below 0.2 %.

How does the CTC-80S-BC achieve ≤ 0.05 % solar cell breakage?

Instead of mechanical cleaving that initiates microcracks, the CTC-80S-BC combines precision laser scribing with water-assisted thermal splitting and ±0.05 mm CCD vision alignment, reaching up to 7,200 pcs/h with ≤ 0.05 % breakage on Grade A cells.

When does the CTM-S150 integrated cutting and stringing system make sense?

For high-output 500–800 MW halls, the CTM-S150 combines cell loading, scribing, splitting, stringing and string discharge into one continuous machine at up to 15,000 half-cells/h — eliminating intermediate cassette handling between separate cutters and stringers.

Have you delivered a complete PV module production line outside China?

Yes. Our team and strategic PV equipment partner delivered a complete 300 MW crystalline-silicon photovoltaic module production line in Bangladesh, covering factory acceptance in China, export crating, cleanroom installation, operator training and turnkey production handover.

How many operators are required for a 150 MW versus a 500–800 MW PV module line?

Standard automated configurations require approximately 25–32 operators per shift for a 150 MW line and approximately 27–34 operators per shift for a higher-automation 500–800 MW line.

Factory quote

Plan your PV module line

Tell us which machines, lines or materials you need, your quantity and delivery country. An engineer in Wuhan replies within one working day.

What are you sourcing?
Message us on WhatsApp

Request a quote