Industry solution PowerMake

Battery pack and energy-storage manufacturing lines

ZeroLine plans and delivers production lines for lithium-ion energy-storage modules and PACKs, from incoming cell sorting to end-of-line testing, built by partner factories in Wuhan and run before they ship. Our reference is the Stratavolt 8 PPM prismatic line: 21 stations, about 2.46 GWh a year with 314 Ah cells. Busbar laser welding comes from Maxwave Laser.

Reference line takt, counted in cells
8 PPM
A year with 314 Ah cells, 20 h × 300 days, 85% OEE
≈ 2.46 GWh
Prismatic cells the reference line is designed around
314–587 Ah
Starting price of the reference line
RMB 2 m+

Scope

What a line includes

  • Power

    Cell incoming and sorting

    • Depalletizing and code reading
    • OCV and internal-resistance testing
    • Grading and sorting
    • Cell surface cleaning and insulation
    Cell test and sorting on Stratavolt
  • Power

    Module stacking and welding

    • Gluing and stacking
    • Compression and strapping
    • Busbar laser welding
    • Weld inspection by vision
    Busbar laser welding station
  • Power

    PACK assembly

    • Module placement into the pack
    • Harness, BMS and high-voltage parts
    • Liquid-cooling plates and thermal pads
    • Screw-driving and lid closing
    Process and layout on Stratavolt
  • Power

    Test and traceability

    • Module and PACK end-of-line test
    • Insulation and hi-pot
    • Air-tightness test
    • MES with per-cell traceability
    End-of-line test station
  • Make

    Lasers for the line

    • Fiber lasers for busbar and terminal welding
    • Laser cleaning before welding and gluing
    • Laser marking of cell and pack codes
    Laser machines from Maxwave
  • ZeroLine

    Plant and utilities

    • Layout for your building
    • Compressed air, power and extraction lists
    • Conveyors and logistics
    • Operator training plan
    Turnkey plants

How it runs

How a line project runs

  1. 01

    Cell and target

    You share the cell datasheet, module and PACK drawings, and the GWh you need.

    Week 1

  2. 02

    Line concept and price

    Takt, station list, layout for your building, staffing and a priced proposal.

    Weeks 2–4

  3. 03

    Design and build

    Detailed design, fixtures for your cell, build at the partner factories in Wuhan.

    Typically 3–5 months

  4. 04

    Acceptance in Wuhan

    The line runs your cells before it is crated. You watch the acceptance test live or on video.

    1–2 weeks

  5. 05

    Install and ramp up

    Our engineers install, commission and train your team on site, then stay through ramp-up.

    Typically 6–10 weeks

Projects

Typical projects

The scope, scale and schedule of projects like this. Ask us for references in your country.

  • Representative case PowerMake

    8 PPM module and PACK line for a storage integrator in the Gulf

    An integrator that imported finished PACKs moved assembly into its own hall: one 55 m line built for a 60 Hz grid, first PACK about six months after contract.

    Output
    ≈ 2.4 GWh a year, two shifts
    Takt at site acceptance
    8.0 PPM over 72 h
    First-pass yield
    99.3 % (equipment)
    Contract to first PACK
    ≈ 6 months
    • Cell test and sorting
    • Busbar laser welding
    • PACK assembly and EOL
    • MES link
    • Pulsed laser cleaner
    • Installation and training
  • Typical scope PowerMake

    8 PPM energy-storage module and PACK line

    A fully specified prismatic line for a storage integrator moving PACK assembly into its own market.

    Output
    ≈ 2.46 GWh a year (314 Ah)
    Stations
    21 in three segments
    Footprint
    55 × 9 × 3.5 m
    Schedule
    ≈ 5–7 months to production
    • Cell test and sorting
    • Stacking and busbar laser welding
    • PACK assembly
    • EOL and air-tightness test
    • MES
    • Installation and ramp-up

    Typical markets · Gulf states, India, Southeast Asia

  • Typical scope Power

    Semi-automatic PACK line for C&I storage

    A smaller line with manual and semi-automatic stations, for commercial and industrial storage cabinets at lower volume.

    Output
    ≈ 0.2–0.5 GWh a year
    Stations
    ≈ 10–14
    Staff
    ≈ 12–20 per shift
    Schedule
    ≈ 3–5 months to production
    • Cell sorting
    • Manual stacking with fixtures
    • Laser welding station
    • PACK assembly
    • EOL test
    • Operator training

    Typical markets · Africa, Latin America, Central Asia

All project types
How much does a battery PACK assembly line cost?

The Stratavolt 8 PPM prismatic ESS line starts at RMB 2 million for the base configuration, run by about 21 operators with automatic and manual stations. Adding MES, logistics and automation takes it to about RMB 3–5 million. Fully automatic GWh-scale module and PACK lines typically cost RMB 12–40 million or more in China, and 1.5–2 times that per unit of capacity when delivered abroad, so prices per GWh are only comparable at the same level of automation. Send your cell datasheet and target capacity for a matched configuration and a firm quote.

How much can one line produce a year?

Annual GWh = takt in cells per minute × 60 × hours per day × days per year × OEE × cell energy. At 8 PPM with 314 Ah cells, 20 hours a day, 300 days and 85% OEE, that is about 2.46 GWh; with 587 Ah cells at the same takt, about 4.6 GWh.

Can the line take larger cells later?

The reference line is designed around 314 Ah prismatic cells with 587 Ah in mind. Moving to a new cell format usually means new fixtures and grippers rather than a new line. We check this at the concept stage.

Do you build lines for cylindrical or pouch cells?

Yes, through partner factories that specialise in them, for e-mobility, telecom backup and small storage packs. Share the cell and pack drawings and we propose the station list and takt.

Can you supply the cells and BMS as well?

We can source cells, BMS, harnesses and enclosures from partner factories and qualify samples on your line before volume orders. Many customers keep their own cell supplier; the line is built for the cell you choose.

Can you supply equipment to make battery cells?

No. China restricts the export of cell-making equipment (winding, stacking, electrolyte filling, formation and grading) and of LFP cathode technology, and we do not supply them. Module and PACK assembly and test equipment, which is what our lines are, is not on that list. We check the rules again for every order.