Turnkey fiber-optic cable manufacturing plants

For operators, governments and investors who want to make optical cable in their own country, ZeroLine plans and delivers the plant: secondary coating, stranding, sheathing, armouring, drop-cable and patch-cord lines and a test lab. Process know-how and long-term fiber supply come from Optics Valley, the world’s largest base for optical fiber and cable.

Of the world's optical fiber and cable comes from the Optics Valley cluster
≈ 25%
Cable families built and tested to the standard
IEC 60794
Process training for your engineers before start-up
In Wuhan
Lines, lab, raw materials and start-up
One contract

Scope

What a plant includes

  • Connect

    Loose-tube production

    • Fiber coloring and rewinding
    • Secondary coating (loose-tube) lines
    • Gel filling and tube take-up
  • Connect

    Cabling

    • SZ stranding lines
    • PE and LSZH sheathing lines
    • Steel-tape armouring
    • ADSS and figure-8 lines
  • Connect

    FTTH products

    • Flat and round drop-cable lines
    • Patch-cord and pigtail assembly
    • Connector polishing and end-face inspection
  • Connect

    Test lab

    • OTDR and attenuation measurement
    • Tensile, crush, impact and bend tests
    • Temperature-cycling chamber
    • Insertion- and return-loss testers
  • ZeroLine

    Materials and supply

    • G.652.D and G.657 fiber under long-term contract
    • PBT, PE, LSZH, gel, yarns and tapes
    • Reels and packaging
    Optical fiber on ZeroLine Connect
  • ZeroLine

    Plant

    • Product mix and capacity plan
    • Building layout and utilities
    • Installation, start-up and operator training
    Turnkey plants

How it runs

How a plant project runs

  1. 01

    Market and mix

    Which cables your market buys, in what volumes, and which to make first.

    Weeks 1–4

  2. 02

    Plant design

    Line list, layout, utilities, staffing, raw-material plan and a priced proposal.

    Weeks 4–10

  3. 03

    Build and acceptance

    Lines built and run in China with your engineers present for acceptance.

    Typically 4–7 months

  4. 04

    Training

    Your process and quality team trains on running lines in Optics Valley.

    2–6 weeks, in parallel

  5. 05

    Install and start up

    Installation, first production, type tests and ramp-up support on site.

    Typically 2–4 months

Projects

Typical projects

The scope, scale and schedule of projects like this. Ask us for references in your country.

  • Typical scope Connect

    Optical cable plant for a national market

    A first plant making the drop, duct and ADSS cable a country imports today, with fiber supplied from Optics Valley.

    Products
    Drop, duct and ADSS cable
    Lines
    Coloring, loose tube, stranding, sheathing
    Lab
    Optical, mechanical and climate tests
    Schedule
    ≈ 9–14 months to first cable
    • Market and product-mix study
    • Plant layout and utilities
    • Lines and test lab
    • Training in Wuhan
    • Long-term fiber supply

    Typical markets · Africa, Middle East, Central Asia

  • Typical scope Connect

    Patch-cord and pigtail assembly plant

    A compact plant assembling and testing patch cords, pigtails and pre-connectorised drops for local operators.

    Products
    Patch cords, pigtails, drops
    Equipment
    Polishing, end-face and IL/RL test
    Space
    Fits an existing light-industrial unit
    Schedule
    ≈ 3–5 months to production
    • Workstation layout
    • Polishing and test equipment
    • Connectors and cable supply
    • Operator training
    • Quality procedures

    Typical markets · Africa, Latin America, South Asia

All project types
Do we need to draw our own fiber?

No. Most new cable plants buy fiber on reels, then color it, put it into tubes and make cable from it. Preform and fiber drawing is a much larger investment that few markets need at the start. We can supply fiber from Optics Valley under a long-term contract.

Which cables should a new plant make first?

Usually the ones your operators buy most and import today: drop cable, duct cable and ADSS. We size the first lines to that demand and leave space to add more.

How long until first production?

For a plant in an existing building, typically 9 to 14 months from contract to first cable, depending on the line mix and site works.

Who trains our team?

Engineers from cable plants in Optics Valley train your process and quality staff on running lines in Wuhan, then support start-up on your site.